You don't have javascript enabled. Good luck with that.
Pencarian
Sudin Bina Marga Jaksel Perbaiki Tiga Lokasi Trotoar di Pasar Minggu

Sidewalks Repair in Pasar Minggu Targeted to Finish Next Week

The repair work of damaged sidewalks in three locations in Pasar Minggu Sub-district is targeted to complete next week. South Jakarta Bina Marga Sub-agency has carried out this repair since the end of August.

We deploy 8-10 personnel in one location to replace broken concrete blocks

South Jakarta Bina Marga Sub-agency Head, Heru Suwondo conveyed, his side is currently repaired sidewalk on Jalan Menara (Jati Padang Urban Village), Jalan Graha Elnusa, and Jerut Purut (Cilandak Timur Urban Village).

"Those sidewalk were heavily damaged. Lots of broken and missing concrete blocks," he mentioned, Thursday (9/10).

Cakung Flyover Development Process Has Reached 71 Percent

On each locations, he said, there are 10-15 damaged points with size around 5-10 meters.

"We deploy 8-10 personnel in one location to replace broken concrete blocks," he said.

So far, the repair work has reached 90 percent and targeted to finish next week.

"Thus people can be comfort and safe in using the sidewalks and to make it look beautiful," he explained.

Linked News
Popular News indeks
  1. Cilandak Drainage Upgraded to Mitigate Flooding

    access_time27-01-2026 remove_red_eye869 personTiyo Surya Sakti
  2. TransJabodetabek Expansion, a Strategic Step to Increase Public Transportation Use

    access_time26-01-2026 remove_red_eye424 personFakhrizal Fakhri
  3. Jakarta Prepares OMC and 200 Excavators to Prevent Flood

    access_time26-01-2026 remove_red_eye371 personDessy Suciati
  4. Several Microtrans Routes Diverted

    access_time31-01-2026 remove_red_eye358 personAldi Geri Lumban Tobing
  5. Jakarta Showers to Make Way for Partly Cloudy Skies

    access_time30-01-2026 remove_red_eye358 personDessy Suciati
close