You don't have javascript enabled. Good luck with that.
Pencarian
Sudin Bina Marga Jaksel Perbaiki Tiga Lokasi Trotoar di Pasar Minggu

Sidewalks Repair in Pasar Minggu Targeted to Finish Next Week

The repair work of damaged sidewalks in three locations in Pasar Minggu Sub-district is targeted to complete next week. South Jakarta Bina Marga Sub-agency has carried out this repair since the end of August.

We deploy 8-10 personnel in one location to replace broken concrete blocks

South Jakarta Bina Marga Sub-agency Head, Heru Suwondo conveyed, his side is currently repaired sidewalk on Jalan Menara (Jati Padang Urban Village), Jalan Graha Elnusa, and Jerut Purut (Cilandak Timur Urban Village).

"Those sidewalk were heavily damaged. Lots of broken and missing concrete blocks," he mentioned, Thursday (9/10).

Cakung Flyover Development Process Has Reached 71 Percent

On each locations, he said, there are 10-15 damaged points with size around 5-10 meters.

"We deploy 8-10 personnel in one location to replace broken concrete blocks," he said.

So far, the repair work has reached 90 percent and targeted to finish next week.

"Thus people can be comfort and safe in using the sidewalks and to make it look beautiful," he explained.

Linked News
Popular News indeks
  1. Jakarta Government Guarantees Full Medical Care for Bantargebang Landslide Victims

    access_time09-03-2026 remove_red_eye1296 personDessy Suciati
  2. Commission E Supports Restricting Children's Access to Social Media

    access_time09-03-2026 remove_red_eye1126 personFakhrizal Fakhri
  3. Affordable and High-Quality Staple Goods Offered at Ramadan Bazaar

    access_time09-03-2026 remove_red_eye838 personAldi Geri Lumban Tobing
  4. Jakarta Planetarium Rolls Out Varied Shows for Eid al-Fitr Holiday

    access_time11-03-2026 remove_red_eye289 personAldi Geri Lumban Tobing
  5. Jakarta Speeds Up Flood Mitigation Efforts

    access_time08-03-2026 remove_red_eye285 personAldi Geri Lumban Tobing